Weak-Grid Load Shedding

Storage for Markets Where the Grid Drops Every Day

Stage 4–6 load shedding means 8–12 hours without power, every day. A generator is loud, expensive and needs fuel you may not be able to buy. A UPS lasts minutes, not hours.


What Actually Happens During Load Shedding

LoadRuntime on 15.36 kWhRuntime on 30.72 kWh
Fridge + freezer (150 W avg)~85 h~170 h
Lights + router + TV (250 W)~52 h~105 h
Above + security + borehole pump (800 W)~17 h~35 h
Whole house including geyser (2,500 W)~5 h~11 h

Figures assume 90% depth of discharge and no solar input. With a 5 kW PV array, daytime loads are carried by solar and the battery refills before the evening outage.


The Configuration

ComponentSpecification
InverterAPOLLO C, 6 kW or 12 kW, pure sine wave
Storage15.36 kWh or 30.72 kWh LFP, 51.2 V
Transfer time10 ms — no reboot on computers or routers
Depth of discharge95% usable
Cycle life8,000 cycles at 90% DoD
Warranty10 years / 70% capacity
CertificationCE (LVD, EMC, RoHS), IEC 62619, UN38.3

How to Size It

Add up the watts of everything you want to keep running, multiply by the hours you need, divide by 0.9. That is your kWh. Then check the peak — a fridge compressor and a borehole pump starting together can pull three times their running watts.

Most households that want the fridge, lights, router, TV and security to survive an 8-hour outage land on 15.36 kWh. Households that want the geyser or air-conditioning to keep running land on 30.72 kWh or two units in parallel.


The Certification Boundary

APOLLO C is a backup and off-grid system. It does not carry EN 50549, VDE-AR-N 4105, G99 or CEI 0-21, so it cannot be configured for grid export in the EU or UK. It runs your loads, charges from solar or grid, and does not push power back.

For most weak-grid markets this is exactly the requirement. If your project needs export, tell us on the first call.


Send Us Your Load List

Appliance, running watts, hours per day, and how many hours of autonomy you need. We will return a sizing sheet.