Certification and Compliance by Market
Which certificate your project needs depends on the country, the grid operator and whether the system exports. This page sets out what ships with every unit, and how we handle grid-code certification project by project.
Ships With Every Unit
| Certification | Scope | Status |
|---|---|---|
| CE — LVD 2014/35/EU | Electrical safety of low-voltage equipment | ✅ Held |
| CE — EMC 2014/30/EU | Electromagnetic compatibility | ✅ Held |
| CE — RoHS 2011/65/EU | Restricted hazardous substances | ✅ Held |
| IEC 62619 | Safety of industrial lithium cells and batteries | ✅ Held |
| UN38.3 | Transport safety — air, sea, road | ✅ Held |
| MSDS | Material safety data sheet for shipping | ✅ Held |
Grid-Code Certification — Status by Market
| Market / certificate | What it governs | How we supply it |
|---|---|---|
| EN 50549-1 / -2 (EU) | Connection of generating plants to LV/MV distribution networks | Certified inverter from our local partner, with our battery behind it |
| VDE-AR-N 4105 (DE) | German LV grid connection | Confirmed at quotation, per project |
| G98 / G99 (UK) | UK grid connection | Confirmed at quotation, per project |
| CEI 0-21 (IT) | Italian LV grid connection | Confirmed at quotation, per project |
| UL 9540 / UL 9540A (US, CA) | US and Canadian energy storage systems | Not offered — we do not supply UL-listed systems |
| IEC 62933 | Grid-integrated electrical energy storage systems | In progress on the container line |
Where Our Equipment Fits Best
Most of our volume goes into:
- Off-grid systems with no distribution network connection
- Backup systems that do not export to the grid
- Weak-grid and load-shedding applications behind the meter
- Telecom and industrial DC power
- Behind-the-meter peak shaving and self-consumption without export
For grid-connected projects we work one of two ways:
- A certified inverter from a local partner, with our battery behind it — the certified assembly is the inverter
- A local EPC who holds the system certification and accepts our equipment under their own declaration
Either way, the certificate holder is named in writing before the order, not after.
If Your Project Needs Grid Code
There are three legitimate routes, and we will help you with any of them:
- Buy a certified inverter locally and use our battery behind it — the certified assembly is the inverter, and the battery does not change it
- Use a local EPC who holds the certification for the assembled system and will accept equipment under their own declaration
- Wait for IEC 62933 to complete on our container line, for container projects
Send Us Your Certification Requirement
Tell us the project country, the grid operator and the certification the tender requires. We will confirm in writing whether we can meet it.
