Telecom Site Power

Telecom Site Power: Solar-Hybrid, Rectifier and Backup

Twenty years of telecom energy engineering behind every cabinet. Outdoor −48 V DC systems, solar-hybrid containers and lithium retrofit kits for BTS, microwave and edge sites.

ABAXEN solar-hybrid telecom power container

−48 V DC · IP55 outdoor · Solar-ready · Remote monitoring · Anti-theft design


Why Telecom Sites Are a Different Problem

A telecom site is not a small version of a commercial building. It runs on DC, it sits somewhere a truck cannot easily reach, and the person who maintains it visits once a quarter at best. Every design decision follows from that.

DC, Not AC

Rectifier banks at −48 V DC feed the radio directly. Converting to AC and back costs you 8–12% round-trip and adds a failure point.

Fuel Is the Real Cost

A remote off-grid BTS in West Africa burns 8,000–15,000 litres a year. Logistics and theft often cost more than the diesel itself.

Nobody Is On Site

Design for a quarterly visit, not a daily one. Remote monitoring, wide temperature tolerance and anti-theft fasteners are not optional.

Loads Are Predictable

A BTS draws a near-constant 1–4 kW with a known peak. That makes sizing straightforward — and makes solar-hybrid payback calculable.


Three Ways We Solve It

ApproachWhat we supplyBest for
Solar-hybrid container20 ft ISO container, 25–30 kW PV input, 40–50 kWh LFP, −48 V rectifier bank, 15 kW genset input, remote monitoringOff-grid or unreliable-grid BTS sites with 2–4 kW average load
Outdoor DC cabinetHJ-SG-D02 series, IP55, integrated rectifier + lithium + controller, pole or pad mountedUrban and suburban sites where a container will not fit or will not be permitted
Lithium retrofitDrop-in LFP replacement for existing lead-acid banks, same footprint, same voltage windowSites with working rectifiers and aging VRLA banks

What We Ask Before We Quote

  • Site location and grid status (on-grid / unreliable / fully off-grid)
  • Average and peak DC load in amperes, or radio count and model
  • Existing backup autonomy requirement in hours
  • Diesel price per litre and annual generator runtime, if a genset exists
  • Ambient temperature range and whether the site is air-conditioned
  • Available footprint and whether a crane can reach the site

Send those six data points and we return a sized configuration, a bill of materials and a budget price. No registration, no sales call first.


Send Us Your Site List

Even a spreadsheet with site name, load and grid status is enough to start. Ten sites or a thousand, the process is the same.

Explore the Product Line